PERANCANGAN SISTEM INFORMASI PENANGANAN PROYEK

PADA PT. NIRA MURNI KONSTRUKSI CILEGON

  • Yudiansyah Fauzi

Abstract

PT.Nira Murni Contructionis a Company to move in contraction level, beside it rent of weight tools for example Crane, Welding Machine etc. The Problems of PT. Nira Murni Contruction is making Report. This TA explain about project management information system based computer, with easier making process, mking project report. The methods are system analize methode, the structure style use DFD ( Data Flow Diagram), this aplication project use Visual Basic 6.0programme and Seagate report 7.0 for eporting the hardware are processor pentium IV, 512 of RAM, 80 GB of harddisk, keyboard, mouse, monitor ’15 and Print.

Published
2017-10-21
How to Cite
FAUZI, Yudiansyah. PERANCANGAN SISTEM INFORMASI PENANGANAN PROYEK. Commerce Jurnal Ilmiah, [S.l.], v. 5, n. 2, p. 145-157, oct. 2017. ISSN 2503-2798. Available at: <http://jurnal.piksiinputserang.ac.id/ojs-3.0.2/index.php/01/article/view/32>. Date accessed: 18 nov. 2017.